JLL
value
£110,000
duration
8 weeks
LOCATION
Belgravia, London SW1

The works consisted of:
- Full strip out of basement fixtures and fittings including all floor base and screed.
- Full install of new insulated base and underfloor heating and electrics to basement.
- Install of new liquid screed base to whole basement area.
- Install of all new floor coverings, luxury high end kitchen and decoration to whole area.
Challenges
This project posed it challenges due to the tight timescale to hand the project back over to the client, we used alternative products to cut down drying times in order to achieve this.